A State-of-the-art, Planned Advanced Manufacturing Building totaling ±892,546 SF on ±61.4 Acres w/ 50MW of Power |
A State-of-the-art, Planned Advanced Manufacturing Building totaling ±892,546 SF on ±61.4 Acres w/ 50MW of Power |
|
Office size:
Up to ±52,950 SF (2-levels) Clear heights:
32’ for Level 1 36’ for Level 2 Freight Elevators
from Level 1 connects with Level 2 Loading:
12 dock-high doors (with potential for more) 2 grade-level doors (with potential for more) |
Column Spacing:
Consistent on all levels Parking:
1,769 (2.0/1,000 SF) car stalls & 40 trailer stalls, Includes 3 level parking garage with 837 car spaces Power:
50MW + 7MW roof deck solar & battery storage (equivalent of ±74,000 AMPS @ 480V, 3 Phase) Tractor trailer access
to Levels 1 & 2 |
Building DetailsLevel 1
Level 2
|
|
Caltrain Times
(from Bayshore Caltrain) 22nd Street Caltrain | 5 Minutes San Francisco Caltrain | 13 Minutes Millbrae Caltrain | 15 Minutes San Mateo Caltrain | 26 Minutes Palo Alto Caltrain | 52 Minutes Santa Clara Caltrain | 83 Minutes Shuttles to Millbrae BART & Caltrain
(From 430 Valley Drive) Distance: 8.1 Miles | 16 Minutes Shuttles to Balboa Park BART & Caltrain
(From 101-111 S Hill Drive) Distance: 4.1 Miles | 13 Minutes |
Talent to Innovate
|
Talent to Move
|
Highly Secure Campus Site |
|
Historically industrial areas of San Francisco, like SOMA and Mission Bay, have witnessed a surge of redevelopment in the last two decades, where 73% of the demolished inventory is centered. The SF Peninsula is one of California’s oldest industrial submarkets with the greatest amount of functional obsolescence. |
|
No new Planned Industrial currently in
Development/Construction Pipeline for all of SF Peninsula |